Abstract:
This contribution focuses on optimizing the layout of the two production lines for Daimler (hereinafter referred to as DA) and VW Group (hereinafter referred to as VAG) products in the company BOS Automotive Products ltd. The main reason for this optimization is the reduction of the spatial arrangement of the production hall with regard to the planned production. The aim of this study is to optimize the spatial arrangement of the CARGO LOADER (hereinafter referred to as CL) production hall, where storage systems for automobiles are produced on the Daimler and VW Group production lines.